National Highway 32 | ||||
---|---|---|---|---|
Route information | ||||
Part of AH20 | ||||
Length | 657 km (408 mi) | |||
Major junctions | ||||
North end | Chennai | |||
South end | Thoothukudi | |||
Location | ||||
Country | India | |||
States | Tamil Nadu, Puducherry | |||
Primary destinations | Tambaram, Perungalathur, Chengalpattu, Tindivanam, Puducherry, Cuddalore, Chidambaram, Sirkali, Tharangambadi, Karaikal, Nagapattinam, Velankanni, Thiruthuraipoondi, Muthupet, Adirampattinam, Manamelkudi, Mimisal[Thondi], Devipattinam, Ramanathapuram, Thoothukudi | |||
Highway system | ||||
|
National Highway 32 (NH 32) is a National Highway in India. It starts from Chennai and terminates at Thoothukudi.[1][2] It is also known as East Coast Road.
The highway is extended up to Thoothukudi as per the notification on 5 December 2017.[3]
The highway starting from its junction with NH-48 near Chennai connecting Chengalpattu, Tindivanam, Puducherry, Cuddalore, Chidambaram, Karaikal, Nagapattinam, Velankanni, Thiruthuraipoondi, Muthupettai, Adirampattinam, Manamelkudi, Thondi, Devipattinam, Ramanathapuram bypass, Thiruppullani, Keelakarai, Ervadi, Valinokkam, Sayalgudi, Vembar, Vaippar, Kulathur, Veppalodai, Pattina, Maruthur and terminating at its junction with NH-44 near Thoothukudi.[3]
This section is missing a table that represents a list of exits or junctions. Please help by adding the missing exit or junction list. (November 2021) |
The highway is planned to extend with a 123 kilometres (76 mi) long stretch from Thoothukudi to Kanyakumari. The preparation for DPR have started.[4]
The highway is planned to be made into a four lane stretch in three phases. In the first phase, four lane will be completed from Thoothkudi to Karaikudi covering 230.2 kilometres (143.0 mi). Next phase of four laning will be completed from Karaikudi to Cuddalore covering 222.3 kilometres (138.1 mi). The last phase of four laning will be completed in Cuddalore to Chennai stretch covering 204.5 kilometres (127.1 mi). The preparation for DPR is completed for first phase of four-lane making.
{{cite web}}
: CS1 maint: archived copy as title (link)