General information | |||||
---|---|---|---|---|---|
Other names | Nishi-Chita Hospital Station (加木屋中ノ池駅, Kōritsu Nishi-Chita sōgō Byōinmae-eki) | ||||
Location | 46-2 Karabatake, Kagiya-machi, Tokai-shi, Aichi-ken Japan | ||||
Coordinates | 35°0′0″N 136°54′9.3″E / 35.00000°N 136.902583°E / 35.00000; 136.902583 | ||||
Operated by | Meitetsu | ||||
Line(s) | ■ Meitetsu Kōwa Line | ||||
Platforms | 2 side platforms | ||||
Construction | |||||
Structure type | Below-grade | ||||
Accessible | Yes | ||||
Other information | |||||
Status | Staffed | ||||
Station code | KC02 | ||||
Website | Official website | ||||
History | |||||
Opened | 16 March 2024 | ||||
|
Kagiya-nakanoike Station (加木屋中ノ池駅, Kagiya-nakanoike-eki) is a railway station in the city of Tōkai, Aichi Prefecture, Japan, operated by Meitetsu.
Kagiya-nakanoike Station is served by the Meitetsu Kōwa Line, and is located 1.4 kilometers in either direction from the neighbouring stations at Takayokosuka and Minami-Kagiya.[1]
The station has two opposed side platforms connected by a footbridge. The station has automated ticket machines, Manaca automated turnstiles and is staffed.[2]
← | Service | → | ||
---|---|---|---|---|
Meitetsu Kōwa Line | ||||
Limited Express: Does not stop at this station | ||||
Rapid Express: Does not stop at this station | ||||
Express: Does not stop at this station | ||||
Semi Express: Does not stop at this station | ||||
Takayokosuka | Local | Minami Kagiya |
In 2015, Meitetsu and Aichi Prefecture agreed to construct a new station on the Kowa Line between Takayokosuka and Minami Kagiya in anticipation of the opening of the Nishi-Chita General Hospital.[3]
The name of the station, Kagiya-nakanoike Station, was finalized on 22 December 2022.[1] A secondary name, Nishi-Chita Hospital Station (加木屋中ノ池駅, Kōritsu Nishi-Chita sōgō Byōinmae-eki), was added at the request of the city of Tokai.[2]
The station opened on 16 March 2024 as finalized on 1 September 2023.[2][4] Initially, at the time of the station's opening, only the north exit became operational. The south exit will only be opened at a later date.[5]